Composed Tier-2/Tier-3 harness and installed acceptance successor of excluded #141 #227
Labels
No labels
accessibility
bug
documentation
duplicate
enhancement
good first issue
help wanted
invalid
P1
P2
P3
question
wontfix
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Depends on
#183 G08: Define authorized Router state and reconnectable events for Console and CLI consumers
Creatidy/scarcity-router
Reference
Creatidy/scarcity-router#227
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Goal
Product owner: Scarcity Router (receiving composed acceptance). Registered by the 2026-10-27 owner backlog disposition (D-083) as the active successor of excluded
wontfixissue #141. Own the outstanding Tier-2/Tier-3 harness and installed integration acceptance as a downstream stage that follows the required component implementations and artifacts — never an upstream implementation prerequisite for them.Why and Evidence
#141 (child I of program #132) was the composed acceptance/closeout child: walk the complete self-hosted path as one product, rehearse the representative target against composed fixtures, update docs coherently and deliver the program closeout report. Its D-056 pt 10 addendum defines the layered evidence shape (Tier 1 generic protocol fixtures — the #133 family, delivered; Tier 2 representative coding harness; Tier 3 broader harness evidence as practical). The 2026-10-27 reconciliation found #141
wontfix-excluded whiledocs/roadmap.mdanddocs/m10-acceptance.mdstill assign it composed acceptance, and found the former #186 → #141 dependency inverted relative to the canonical ordering (composed acceptance receives installed proof after component delivery). Children A–F of the program are delivered and closed; G/H/I obligations are re-homed (#139 → #224, #140 → #226 plus #183 producer state, this issue for I).Scope
Acceptance Criteria
NOT LIVE VERIFIEDwhere a harness cannot be exercised.uv sync --only-dev,make check,uv run basedpyright,git diff --check); fresh independent technical+UX review at exact frozen HEAD/base.docs/m10-acceptance.md); this issue does not claim it.Constraints
Docs + friction fixes + composed tests only; substantive product changes get their own issues. No release, tag, deployment, main promotion, live provider calls or signing. This issue depends on the component implementations and artifacts it receives (native dependencies on #183 and #186); it must never block their construction.
Links
Excluded predecessor #141 (historical, unchanged); D-083 disposition; program history #132; D-056 pt 10 layered acceptance; component producers #183 (state/events), #186 (artifacts/platform), #224 (transport/TLS), #226 (admin UX);
docs/m10-acceptance.md.Current owner triage, 2026-11-01: P2, downstream acceptance. Native dependencies #183 and #186 remain valid for receiving their producer state and installed artifacts; this issue must never block those components' implementation. Router owns composed Tier-2/Tier-3 and installed acceptance; actual component receipts and separately authorized live/platform evidence remain unmet. Earliest independent work is fixture/acceptance planning and evidence inventory without claiming missing components or live compatibility as passed. No new dependency or live execution is authorized.